Commissioner & Director of Municipal Administration

Government of Telangana
CM/Minister Assurance Development Works

Completed At Estimation(TS)  - CDMA

Rs. In Lakhs
SNoWORK_CODENAME_OF_THE_WORKADMIN_SANCTION_AMOUNTCR_DATEUPDATED_ON
11Construction of CC drain from Santhosh (H) to New water tank, Ramulu (H) to Shaik Waheed (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.516/05/201711 Apr 2018
22Construction of CC drain from Ahmed Hussain (H) to Shaik Masthan (H), Meer jaffer ali (H) to Shair Ahmed (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.516/05/201703 Apr 2018
33Construction of CC drain from Kumar (H) to Shaik Kadhar (H), Sadiq (H) to Habeeb Masque (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.516/05/201721 Mar 2018
44Construction of CC drain from MD Azeem (H) to Saleem (H), Shaik Wajeed (H) to Habeeb Masque (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.516/05/201707 Mar 2018
55Construction of RCC Culverts various locations in Ward No.01 of Armoor Municipality, Nizamabad District.516/05/201725 Apr 2018
66Laying of CC road from H.No.Chandu Shankar (H) to Ramesh (H), and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.516/05/2017 
77Laying of CC road from Srinivas Chary (H) to Pipri Main Road, Dr. Prabhakar (H) Chandan Limbadri (H) and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.5 14 Feb 2018
88Laying of CC road from Jindam Narahari (H) to Gangamani (H), Current Ramulu (H) Dass Hotel and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
99Laying of CC road from Vemula Nadipi Sailu (H) to Makkala Venkati (H) , Makkala Sailu (H) Makkala Peddulu (H) and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1010Laying of CC road from Bandi Poshetty (H) to Oddera Sangam and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1111Laying of CC road from H.No. 1-21-54 to Manohar RMP Dr.(H) and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1212Laying of CC road from H.No.1-21-34 toH.No.1-20-63/9, H.No.1-20-104 to H.No.1-20-98 and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1313Laying of CC road From MIG-1-74 to MIG-1-65, and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1414Laying of CC road from H.No.1-20-70 to H.No.1-20-64, H.No.1-20-57 to H.No.1-20-63 and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1515Laying of CC road from H.No.1-20-56 to H.No.1-20-48 and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1616Laying of CC road from H.No.1-20-30 toHnuman Tample and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
1717Construction of CC Drain works from H.No.1-21-75 to H.No. 1-21-53 and other lanes in Ward No.03 of Armoor Municipaltiy 516/05/201715 Feb 2018
1818Construction of CC Drain works from H.No.1-21-53 to Narshimulu Teacher(H) and other lanes in Ward No.03 of Armoor Municipaltiy 516/05/201715 Feb 2018
1919Construction of CC Drain works from H.No.1-20-2/36/2 to Thambak Shaker(H) , H.No.1-20-16 to H.No. 1-20-30 and other lanes in Ward No.03 of Armoor Municipaltiy 516/05/201715 Feb 2018
2020Construction of CC Drain works from Vijetha Hostel to Kishan(H), VISHNU Appartment to Padal Manoj(H) and other lanes in Ward No.03 of Armoor Municipaltiy Thambak Shaker(H)516/05/201715 Feb 2018
2121Laying of CC road from Sunkari Ravi(H) to Borravva, H.No.3-15-23/2/1 to Electrical Pole No. SC.No.16674 and other roads in Ward No.05 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
2222Laying of CC road from H.No.3-1-1/16 to Vijaya Dental Hospital,H.No.3-5-10 to H.No.3-14-106/1and other roads in Ward No.05 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
2323Construction of CC Drain from H.No.3-14-12/1 to Vannela das Murili, H.No3-14-90/3 to Dora Mohan(H), H.No.3-5-10 to Kallu Dept, H.No.3-14-94/1 to Mudhiraj sangam and other lanes in Ward No.05 of Armoor Municipaltiy 516/05/201721 Mar 2018
2424Construction of CC Drain from H.No.3-15-18 toBhoopathi(H), Sailu (H) to H.No.3-15-18, H.NO.3-15-23/2/1 to Electrical Pole SC.No.16674, K.Ramu(H) to B.Narayana(H). and other lanes in Ward No.05 of Armoor Municipaltiy 516/05/201715 Feb 2018
2525Construction of CC Drain from H.No.3-15-84 to P.Venkati(H), H.No.3-15-97 to Nandu(H), Sankari Ravi to Borranna(H) and other lanes in Ward No.05 of Armoor Municipaltiy 516/05/201703 Apr 2018
2626Laying of CC road from H.No.3-1-39/7/2/3 to exsice office and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.516/05/201721 Mar 2018
2727Laying of CC road from shishu mandir Back side to sadak narayana (H) and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.516/05/201721 Mar 2018
2828Laying of CC road from Shashidhar (H) to Srinivas Reddy(H), Pole No. TC92 and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.516/05/201707 Mar 2018
2929Laying of CC road from Ranga chari(H) to Narsayya(H) and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.516/05/201703 Apr 2018
3030Laying of CC road from Market yard back side (Anu beuity porler to H.No.3-1-41/3/1 and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
3131Laying of CC road from Dr. Venkat reddy(H) to Bhoopathi reddy (H) & Other Lanes in Ward No.08 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
3232Construction of CC Drain from H.No.3-2-54/20 to Khaja (H), Sachin(H) to Ponnala Srinivas(H) and other lanes in Ward No.08 of Armoor Municipaltiy 516/05/201715 Feb 2018
3333Construction of CC Drain from H.No.3-2-54/17 to Dargha, H.No.3-2-15/19 to Kamalaneharu colony khaman and other lanes in Ward No.08 of Armoor Municipaltiy 516/05/201715 Feb 2018
3434Construction of CC Drain from H.No.3-2-6/7 to Shankar(H), Meru Sangam to Ram kishan(H) and other lanes in Ward No.08 of Armoor Municipaltiy 516/05/201715 Feb 2018
3535Construction of CC Drain from H.No.3-2-87/2 to Counciler (H), From Gaddam Narsamma (H) to C.Nagaraju(H), Surya complex to M R O Office Road and other lanes in Ward No.08 of Armoor Municipaltiy 516/05/201715 Feb 2018
3636Laying of CC road from G Narayana (H) to Mohan Supplying Company & Other Lanes in Ward No.09 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
3737Laying of CC road From Dashu (H) to S Srinivas (H), P Ganga Mohan (H) to Bockar Srinivas (H), Panja Narayana (H) opp to N Pavan (H) & Other Lanes in Ward No.09 of Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
3838Construction of CC Drain From Domala Sadanadam (H), From H.No.3-5-100/2/1 to Madhu (H) to Watch Company other lanes in Ward No.09 of Armoor Municipaltiy 516/05/201722 Feb 2018
3939Construction of CC Drain From H.NO.3-6-7 to Odde Gangaram Hotel & Opposite line, In front of Bhaskar (H) NO. 3-4-30, From H.NO.3-4-30 to Likky Lavanya (H), From H.NO.3-5-4 to H.No.3-5-5 and other lanes in Ward No.09 of Armoor Municipaltiy 516/05/201721 Mar 2018
4040Construction of CC Drain From H.NO. 3-4-17 to Anja Goud (H), From H.No.3-4-103 to Domala Sathyam (H), Kalyankar Ganganna (H) to H.No.3-5-26, Geetha Book Depo to Kolu Maruthi (H) and other lanes in Ward No.09 of Armoor Municipaltiy 516/05/201722 Feb 2018
4141Laying of CC road from Minarity khaman galli to Jakkam vittal (H) & Other Roads in Ward No.10 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
4242Laying of CC road from Hanman Temple to Bondla Peddulu (H) & Other Roads in Ward No.10 of Armoor Municipality, Nizamabad District.216/05/201703 Apr 2018
4343Laying of CC road from Pedda Lingaiah shop to Padigela Gangadhar (H) in Ward No.10 of Armoor Municipality, Nizamabad District.316/05/201721 Mar 2018
4444Construction of CC Drain From Koli Hanman Temple to Patla Hanman Temple and other lanes in Ward No.10 of Armoor Municipaltiy 516/05/201703 Apr 2018
4545Construction of CC Drain From Muthyalamma Temple to Control Shop No.10 and other lanes in Ward No.09 of Armoor Municipaltiy 516/05/201716 Feb 2018
4646Construction of CC Drain From Rajaka Sangam to Abbanna Mohan (H) and other lanes in Ward No.10 of Armoor Municipaltiy 516/05/201716 Feb 2018
4747Construction of CC Drain From H.No.4-7-55 to Gundati Mohan(H) and other lanes in Ward No.11 of Armoor Municipaltiy 516/05/201716 Feb 2018
4848Construction of CC Drain From Surya prakash (H) to Hanuman Temple, H.No.3-11-32 to H.No.3-12-30 and other lanes in Ward No.11 of Armoor Municipaltiy 516/05/201716 Feb 2018
4949Construction of CC Drain From Hanuman Temple to Aloor Road, H.No.4-7-115 to Kallu Dept and other lanes in Ward No.11 of Armoor Municipaltiy 516/05/201716 Feb 2018
5050Construction of CC Drain From H.No.3-11-83 to H.No. 3-11-70, K.Mohan Kirana Genaral store to Talari Narsaya(H), Sadha Narsaya (H) to H.No.3-13-63 and other lanes in Ward No.11 of Armoor Municipaltiy 516/05/201716 Feb 2018
5151Construction of CC Drain FromH.NO.3-12-30 TO Jamman Jattigalli, H.NO.3-12-64 TO Jamman Jattigalli, H.NO.3-12-87 TO Shajid(H) and other lanes in Ward No.11 of Armoor Municipaltiy 216/05/201721 Mar 2018
5252Laying of CC Road in Ward No.11, Armoor Municipality 316/05/201716 Feb 2018
5353Construction of CC Drain at Subhash Nagar Colony in Ward No.12 of Armoor Municipaltiy 516/05/201707 Mar 2018
5454Construction of CC Drain from Raju Panthulu (H) to Siddapuram Vittal (H) and other lanes in Ward No.12 of Armoor Municipaltiy 516/05/201716 Feb 2018
5555Construction of CC Drain from Oppt Munnur kapu sangam to Marvadi Neelakantam (H) and other lanes in Ward No.12 of Armoor Municipaltiy 316/05/201703 Apr 2018
5656Laying of CC Road At Mukundu Mallaiah (H) in Ward No.12, Armoor Municipality.216/05/201716 Feb 2018
5757Construction of CC Drain from Aloor Gangaram (H) to Kathelly Sangam and other lanes in Ward No.12 of Armoor Municipaltiy 516/05/201703 Apr 2018
5858Construction of CC Drain at Gundla wada galli in Ward No.12 of Armoor Municipaltiy 516/05/201716 Feb 2018
5959Laying of CC road from Alla Konda Ganaga Mohan(H) to Bandari Poshatti (H) & Other Lanes in Ward No.13 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
6060Construction of CC Drain fromArya Palli yerranna(H) to Bajanna (H) in (1300plots) and other lanes in Ward No.13 of Armoor Municipaltiy 516/05/201716 Feb 2018
6161Construction of CC Drain from H.No4-4-14/10/1 to H.No.4-4-14/3/1/2 and other lanes in Ward No.13 of Armoor Municipaltiy 516/05/201716 Feb 2018
6262Construction of CC Drain fromB.Prasad(H) to Sham Srinivas(H) in (1300plots) and other lanes in Ward No.13 of Armoor Municipaltiy 516/05/201716 Feb 2018
6363Construction of CC Drain from H.No.4-1-23 to H.No. 4-1-32, M.Ranjan(H) to B. Rajanna(H), Ashoknagar and other lanes in Ward No.13 of Armoor Municipaltiy 516/05/201716 Feb 2018
6464Laying of CC road From Devula Narsaiah (H) to Tonikada Swami (H) Near Venkateshwara Kalyana Mandapam & Other Roads in Ward No.14 of Armoor Municipality, Nizamabad District.416/05/201721 Mar 2018
6565Construction of CC Drain From Vegetable Market to Chota bazar and other lanes in Ward No.14 of Armoor Municipaltiy 416/05/201716 Feb 2018
6666Construction of CC Drain From Jagan (H) to B srinu (H) and other lanes in Ward No.14 of Armoor Municipaltiy 416/05/201716 Feb 2018
6767Construction of CC Drain From Jagan goud (H) to Vegitable Market, H.No.2-4-65 to Venkateshwar Temple and other lanes in Ward No.14 of Armoor Municipaltiy 416/05/201716 Feb 2018
6868Construction of CC DrainFrom N. Mahesh (H) to Nawab (H), Vegitable Market to H.No.2-4-95, Srinu H.No.2-3-75 to H.No.3-2-92 and other lanes in Ward No.14 of Armoor Municipaltiy 416/05/201716 Feb 2018
6969Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-I and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7070Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-II and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7171Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-III and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7272Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-IV in Ward No.16 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7373Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-V and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7474Laying of CC road From Sudharshan Patwari (H) to Pragna School & Other Roads in Ward No.19 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7575Construction of CC drain From Rupesh (H) to Mdhan Mohan (H), Thirupathi (H) to Teddu Ganesh (H), H.no.1-9-69/4 to H.No.1-9-69/1, Munnnuru Kapu Sangam to D Sayanna (H) and other lanes in Ward No.19 of Armoor Municipality, Nizamabad District.516/05/201721 Mar 2018
7676Construction of CC drainFrom Nadiipi Bajanna (H) to Muthyamma (H), Sudharshan Patwari (H) to Pragna School, Anganwadi Building to Jawaharmai (H), Akula Abbanna (H) to Shankar (H) and other lanes in Ward No.19 of Armoor Municipality, Nizamabad District.516/05/201722 Feb 2018
7777Construction of CC drainFrom Kallu Batti to Akula Abbanna (H), Abdul Rahaman (H) to Municpal Bore well and other lanes in Ward No.19 of Armoor Municipality, Nizamabad District.516/05/201707 Mar 2018
7878Construction of CC drain From Mee seva to Pula Shankar (H), Shekar (H) to Siddeshwar (H), Masood (H) to Siddeshwar (H) and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
7979Laying of CC road from Madharsa School to Taku Masjid & Other Lanes in Ward No.20 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8080Construction of CC drainFrom H.No.1-3-55/1/2 to Javeed Bhai (H), Chikyala Rajeshwar (H) to Goshala and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8181Construction of CC drainFrom Kaligota Mohan (H) to Pothula Srinivas (H), H.NO.1-8-54/1 to Beside of Bodameda Bojamma, H.No.1-7-12/3 to Main Drain, SS Building to Weekly Market and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8282Construction of CC drain From Sudheer (H) to Akula Narayana (H), At H.NO.1-7-12/7/4, Heera Srinu (H) to Naveen (H), Nayeem (H) to Mujeeb (H) and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8383Construction of CC drain From Javeed Bhai (H) to Abdul Raheem (H), Mujedh (H) to Gangareddy (H), Vasavi Super Market to Gangadhar (H), Thrimurthi Medical to Sri Krishna Medical and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8484Laying of CC road From Takur Painter (H) to T shop, H.NO.1-6-48/11 to Thakur (H), Limbagiri Swami (H) to Padma rao (H), Syam Sunder (H) to infront of H.No.1-6-54/5/8/3 & Other Roads in Ward No.22 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8585Laying of CC road From Vidya School Praveen (H) to A Ravindhar (H), H.no.1-6-125/4/1 Bandari Narayana (H) to Dish Eshwar (H), In front of Mohan Rao Teacher (H), Hostel Narsaiah (H) to Madhava (H)& Other Roads in Ward No.22 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8686Construction of CC drainFrom H.No.1-6-4/1/3 to h.No.1-6-48/10/2, Limbadri Swami (H) to Padma Rao (H) and other lanes in Ward No.22 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8787Construction of CC drainFrom H.No.1-6-125/4/1 to Gomakula Anand (H), Hotel Narsaiah to Madhava (H) and other lanes in Ward No.22 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8888Construction of CC drain Buka Narsaiah Teacher (h) to Petrol Bunk Raju (H) in Ward No.22 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
8989Laying of CC road From H.No.1-5-106/3/2 to H.No.1-5-108, & Other Roads in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9090Laying of CC road From H.No. 1-6-64/1 to H.No.1-69/2, H.No.1-5-111 to 1-5-114, Syed Kazeem (H) to H.No.1-6-2, H.No.1-5-120/1 to H.No.1-5-119/1& Other Roads in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9191Construction of RCC Culvert at Limbadri House ,Syed Mahmud Ali (H) , syed Ahmed (H), Mohd Rezwan (H), Shaik Mukthar (H) opp, Mohd Ahmed Ali (H), Mohd ahmedulla (H), Mubeen (H) 1-5-119/1, Mohd Nizamuddin (H), Habeeb Khan (H), Kathri Samaj beside, Abdul Rasheed(Ex-service men) (H), Kora Posani (H) opp, Mohd Khaza (H), Meer Mazhar Ali (H), Mohd Wahabuddin wajid(H), Mohd Nizamuddin (Retired APSEP Emply) in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9292Construction of CC drain From Bhupal (H) 1-6-47/2/1 to H.No.1-6-47/2, MA Kaleem (H) 1-5-102 to Shaik Muktar (H) opp, and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9393Construction of CC drainFrom H.No.1-5-114 to H.No.1-5-11, H.No.1-6-2 to H.No.1-6-12 and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9494Construction of CC drain From Mohd Nizamuddin LI (H) to Mod Muneeruddin (H), Hotel Inthiyaz (H) to nearby open place and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9595Construction of CC drain From Rajamani (H) to Shamseer (H), Shaik Rahmath Ali (H) to Kabeeruddin Moulana and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.516/05/201716 Feb 2018
9696Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality116/05/201716 Feb 2018
9797Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality116/05/201716 Feb 2018
9898Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality116/05/201716 Feb 2018
9999Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality116/05/201716 Feb 2018
100100Construction of CC Drain in Ward No.13 of Armoor Municipality116/05/201705 Mar 2018
101101Construction of CC Drain in Ward No.13 of Armoor Municipality116/05/201716 Feb 2018
102102Construction of CC Drain with Culvert in Ward No.04 of Armoor Municipality116/05/201716 Feb 2018
103103Construction of CC Drain in Ward No.04 of Armoor Municipality116/05/201716 Feb 2018
104104Construction of CC Drain in Ward No.07 of Armoor Municipality116/05/201716 Feb 2018
105105Construction of CC Drain in Ward No.16 of Armoor Municipality116/05/201716 Feb 2018
106106Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-I in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
107107Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-II in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
108108Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-III in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
109109Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-IV in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
110110Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-V in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
111111Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-VI in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
112112Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-VII in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
113113Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-VIII in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
114114Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-IX in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
115115Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-X in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
116116Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XI in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
117117Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XII in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
118118Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XIII in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
119119Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XIV in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
120120Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XV in Armoor Municipality, Nizamabad District.516/05/201715 Feb 2018
121121Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.416/05/201716 Feb 2018
122122Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.416/05/201716 Feb 2018
123123Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.416/05/201716 Feb 2018
124124Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.416/05/201716 Feb 2018
125125Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.416/05/201716 Feb 2018
126126Construction of CC drain in Saidabad Colony Ward No.06 Bit-I of Armoor Municpality, NiZamabad District 516/05/201721 Mar 2018
127127Construction of CC drain in Saidabad Colony Ward No.06 Bit-II of Armoor Municpality, NiZamabad District 416/05/201707 Mar 2018
128128Construction of CC Road at Take Masjid in Ward No.20 of Armoor Municpality, Nizamabad District116/05/201716 Feb 2018
129129 Construction of CC Drain H.No. 3-12-14 to 3-12-17 of Armoor Municpality, Nizamabad District416/05/201716 Feb 2018
130130N.H. 16 to Pinja Sayamma (H) ( Two Sides )of Armoor Municpality, Nizamabad District416/05/201716 Feb 2018
131131Laying of CC Road from Velding Nagesh (H) to Dr.Ashok , L.K. Hospital of Armoor Municpality, Nizamabad District416/05/201716 Feb 2018
132132Construction of C.C Drain from Gopi Bajanna House to Kartan Narayana House ( Two Sides ) of Armoor Municpality, Nizamabad District 416/05/201716 Feb 2018
133133Laying of CC Road from Post office to Buka Narsaiah Teacher (h) of Armoor Municpality, Nizamabad District416/05/201716 Feb 2018
134134Layin of CC Road in Ward No.19 of Armoor Municipality , Nizamabad District 516/05/201703 Apr 2018
135135Layin of CC Road in Ward No.18 of Armoor Municipality , Nizamabad District 516/05/201721 Mar 2018
136136Laying of CC Road H.No.1-13-20 to 1-13-15, G Linganna (H) to N Oddenna (H), Bajanna (H) to Nadipi Rajanna (H) and other Roads in Ward No.17 of Armoor Municpality, Nizamabad District516/05/201721 Mar 2018