SNoWORK_CODENAME_OF_THE_WORKADMIN_SANCTION_AMOUNTPROPOSAL_SENT_DATEUPDATED_ON
11Construction of CC drain from Santhosh (H) to New water tank, Ramulu (H) to Shaik Waheed (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.517/05/201711 Apr 2018
22Construction of CC drain from Ahmed Hussain (H) to Shaik Masthan (H), Meer jaffer ali (H) to Shair Ahmed (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.517/05/201703 Apr 2018
33Construction of CC drain from Kumar (H) to Shaik Kadhar (H), Sadiq (H) to Habeeb Masque (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.517/05/201721 Mar 2018
44Construction of CC drain from MD Azeem (H) to Saleem (H), Shaik Wajeed (H) to Habeeb Masque (H) and other lanes in Ward No.01 of Armoor Municipality, Nizamabad District.517/05/201707 Mar 2018
55Construction of RCC Culverts various locations in Ward No.01 of Armoor Municipality, Nizamabad District.517/05/201725 Apr 2018
66Laying of CC road from H.No.Chandu Shankar (H) to Ramesh (H), and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.517/05/2017 
78Laying of CC road from Jindam Narahari (H) to Gangamani (H), Current Ramulu (H) Dass Hotel and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
89Laying of CC road from Vemula Nadipi Sailu (H) to Makkala Venkati (H) , Makkala Sailu (H) Makkala Peddulu (H) and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
910Laying of CC road from Bandi Poshetty (H) to Oddera Sangam and other roads in Ward No.02 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1011Laying of CC road from H.No. 1-21-54 to Manohar RMP Dr.(H) and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1112Laying of CC road from H.No.1-21-34 toH.No.1-20-63/9, H.No.1-20-104 to H.No.1-20-98 and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1213Laying of CC road From MIG-1-74 to MIG-1-65, and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1314Laying of CC road from H.No.1-20-70 to H.No.1-20-64, H.No.1-20-57 to H.No.1-20-63 and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1415Laying of CC road from H.No.1-20-56 to H.No.1-20-48 and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1516Laying of CC road from H.No.1-20-30 toHnuman Tample and other roads in Ward No.03 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
1617Construction of CC Drain works from H.No.1-21-75 to H.No. 1-21-53 and other lanes in Ward No.03 of Armoor Municipaltiy 517/05/201715 Feb 2018
1718Construction of CC Drain works from H.No.1-21-53 to Narshimulu Teacher(H) and other lanes in Ward No.03 of Armoor Municipaltiy 517/05/201715 Feb 2018
1819Construction of CC Drain works from H.No.1-20-2/36/2 to Thambak Shaker(H) , H.No.1-20-16 to H.No. 1-20-30 and other lanes in Ward No.03 of Armoor Municipaltiy 517/05/201715 Feb 2018
1920Construction of CC Drain works from Vijetha Hostel to Kishan(H), VISHNU Appartment to Padal Manoj(H) and other lanes in Ward No.03 of Armoor Municipaltiy Thambak Shaker(H)517/05/201715 Feb 2018
2021Laying of CC road from Sunkari Ravi(H) to Borravva, H.No.3-15-23/2/1 to Electrical Pole No. SC.No.16674 and other roads in Ward No.05 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
2122Laying of CC road from H.No.3-1-1/16 to Vijaya Dental Hospital,H.No.3-5-10 to H.No.3-14-106/1and other roads in Ward No.05 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
2223Construction of CC Drain from H.No.3-14-12/1 to Vannela das Murili, H.No3-14-90/3 to Dora Mohan(H), H.No.3-5-10 to Kallu Dept, H.No.3-14-94/1 to Mudhiraj sangam and other lanes in Ward No.05 of Armoor Municipaltiy 517/05/201721 Mar 2018
2324Construction of CC Drain from H.No.3-15-18 toBhoopathi(H), Sailu (H) to H.No.3-15-18, H.NO.3-15-23/2/1 to Electrical Pole SC.No.16674, K.Ramu(H) to B.Narayana(H). and other lanes in Ward No.05 of Armoor Municipaltiy 517/05/201715 Feb 2018
2425Construction of CC Drain from H.No.3-15-84 to P.Venkati(H), H.No.3-15-97 to Nandu(H), Sankari Ravi to Borranna(H) and other lanes in Ward No.05 of Armoor Municipaltiy 517/05/201703 Apr 2018
2526Laying of CC road from H.No.3-1-39/7/2/3 to exsice office and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.517/05/201721 Mar 2018
2627Laying of CC road from shishu mandir Back side to sadak narayana (H) and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.517/05/201721 Mar 2018
2728Laying of CC road from Shashidhar (H) to Srinivas Reddy(H), Pole No. TC92 and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.517/05/201707 Mar 2018
2829Laying of CC road from Ranga chari(H) to Narsayya(H) and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.517/05/201703 Apr 2018
2930Laying of CC road from Market yard back side (Anu beuity porler to H.No.3-1-41/3/1 and other roads in Ward No.07 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
3031Laying of CC road from Dr. Venkat reddy(H) to Bhoopathi reddy (H) & Other Lanes in Ward No.08 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
3132Construction of CC Drain from H.No.3-2-54/20 to Khaja (H), Sachin(H) to Ponnala Srinivas(H) and other lanes in Ward No.08 of Armoor Municipaltiy 517/05/201715 Feb 2018
3233Construction of CC Drain from H.No.3-2-54/17 to Dargha, H.No.3-2-15/19 to Kamalaneharu colony khaman and other lanes in Ward No.08 of Armoor Municipaltiy 517/05/201715 Feb 2018
3334Construction of CC Drain from H.No.3-2-6/7 to Shankar(H), Meru Sangam to Ram kishan(H) and other lanes in Ward No.08 of Armoor Municipaltiy 517/05/201715 Feb 2018
3435Construction of CC Drain from H.No.3-2-87/2 to Counciler (H), From Gaddam Narsamma (H) to C.Nagaraju(H), Surya complex to M R O Office Road and other lanes in Ward No.08 of Armoor Municipaltiy 517/05/201715 Feb 2018
3536Laying of CC road from G Narayana (H) to Mohan Supplying Company & Other Lanes in Ward No.09 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
3637Laying of CC road From Dashu (H) to S Srinivas (H), P Ganga Mohan (H) to Bockar Srinivas (H), Panja Narayana (H) opp to N Pavan (H) & Other Lanes in Ward No.09 of Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
3738Construction of CC Drain From Domala Sadanadam (H), From H.No.3-5-100/2/1 to Madhu (H) to Watch Company other lanes in Ward No.09 of Armoor Municipaltiy 517/05/201722 Feb 2018
3839Construction of CC Drain From H.NO.3-6-7 to Odde Gangaram Hotel & Opposite line, In front of Bhaskar (H) NO. 3-4-30, From H.NO.3-4-30 to Likky Lavanya (H), From H.NO.3-5-4 to H.No.3-5-5 and other lanes in Ward No.09 of Armoor Municipaltiy 517/05/201721 Mar 2018
3940Construction of CC Drain From H.NO. 3-4-17 to Anja Goud (H), From H.No.3-4-103 to Domala Sathyam (H), Kalyankar Ganganna (H) to H.No.3-5-26, Geetha Book Depo to Kolu Maruthi (H) and other lanes in Ward No.09 of Armoor Municipaltiy 517/05/201722 Feb 2018
4041Laying of CC road from Minarity khaman galli to Jakkam vittal (H) & Other Roads in Ward No.10 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
4142Laying of CC road from Hanman Temple to Bondla Peddulu (H) & Other Roads in Ward No.10 of Armoor Municipality, Nizamabad District.217/05/201703 Apr 2018
4243Laying of CC road from Pedda Lingaiah shop to Padigela Gangadhar (H) in Ward No.10 of Armoor Municipality, Nizamabad District.317/05/201721 Mar 2018
4344Construction of CC Drain From Koli Hanman Temple to Patla Hanman Temple and other lanes in Ward No.10 of Armoor Municipaltiy 517/05/201703 Apr 2018
4445Construction of CC Drain From Muthyalamma Temple to Control Shop No.10 and other lanes in Ward No.09 of Armoor Municipaltiy 517/05/201716 Feb 2018
4546Construction of CC Drain From Rajaka Sangam to Abbanna Mohan (H) and other lanes in Ward No.10 of Armoor Municipaltiy 517/05/201716 Feb 2018
4647Construction of CC Drain From H.No.4-7-55 to Gundati Mohan(H) and other lanes in Ward No.11 of Armoor Municipaltiy 517/05/201716 Feb 2018
4748Construction of CC Drain From Surya prakash (H) to Hanuman Temple, H.No.3-11-32 to H.No.3-12-30 and other lanes in Ward No.11 of Armoor Municipaltiy 517/05/201716 Feb 2018
4849Construction of CC Drain From Hanuman Temple to Aloor Road, H.No.4-7-115 to Kallu Dept and other lanes in Ward No.11 of Armoor Municipaltiy 517/05/201716 Feb 2018
4950Construction of CC Drain From H.No.3-11-83 to H.No. 3-11-70, K.Mohan Kirana Genaral store to Talari Narsaya(H), Sadha Narsaya (H) to H.No.3-13-63 and other lanes in Ward No.11 of Armoor Municipaltiy 517/05/201716 Feb 2018
5051Construction of CC Drain FromH.NO.3-12-30 TO Jamman Jattigalli, H.NO.3-12-64 TO Jamman Jattigalli, H.NO.3-12-87 TO Shajid(H) and other lanes in Ward No.11 of Armoor Municipaltiy 217/05/201721 Mar 2018
5152Laying of CC Road in Ward No.11, Armoor Municipality 317/05/201716 Feb 2018
5253Construction of CC Drain at Subhash Nagar Colony in Ward No.12 of Armoor Municipaltiy 517/05/201707 Mar 2018
5354Construction of CC Drain from Raju Panthulu (H) to Siddapuram Vittal (H) and other lanes in Ward No.12 of Armoor Municipaltiy 517/05/201716 Feb 2018
5455Construction of CC Drain from Oppt Munnur kapu sangam to Marvadi Neelakantam (H) and other lanes in Ward No.12 of Armoor Municipaltiy 317/05/201703 Apr 2018
5556Laying of CC Road At Mukundu Mallaiah (H) in Ward No.12, Armoor Municipality.217/05/201716 Feb 2018
5657Construction of CC Drain from Aloor Gangaram (H) to Kathelly Sangam and other lanes in Ward No.12 of Armoor Municipaltiy 517/05/201703 Apr 2018
5758Construction of CC Drain at Gundla wada galli in Ward No.12 of Armoor Municipaltiy 517/05/201716 Feb 2018
5859Laying of CC road from Alla Konda Ganaga Mohan(H) to Bandari Poshatti (H) & Other Lanes in Ward No.13 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
5960Construction of CC Drain fromArya Palli yerranna(H) to Bajanna (H) in (1300plots) and other lanes in Ward No.13 of Armoor Municipaltiy 517/05/201716 Feb 2018
6061Construction of CC Drain from H.No4-4-14/10/1 to H.No.4-4-14/3/1/2 and other lanes in Ward No.13 of Armoor Municipaltiy 517/05/201716 Feb 2018
6162Construction of CC Drain fromB.Prasad(H) to Sham Srinivas(H) in (1300plots) and other lanes in Ward No.13 of Armoor Municipaltiy 517/05/201716 Feb 2018
6263Construction of CC Drain from H.No.4-1-23 to H.No. 4-1-32, M.Ranjan(H) to B. Rajanna(H), Ashoknagar and other lanes in Ward No.13 of Armoor Municipaltiy 517/05/201716 Feb 2018
6364Laying of CC road From Devula Narsaiah (H) to Tonikada Swami (H) Near Venkateshwara Kalyana Mandapam & Other Roads in Ward No.14 of Armoor Municipality, Nizamabad District.417/05/201721 Mar 2018
6465Construction of CC Drain From Vegetable Market to Chota bazar and other lanes in Ward No.14 of Armoor Municipaltiy 417/05/201716 Feb 2018
6566Construction of CC Drain From Jagan (H) to B srinu (H) and other lanes in Ward No.14 of Armoor Municipaltiy 417/05/201716 Feb 2018
6667Construction of CC Drain From Jagan goud (H) to Vegitable Market, H.No.2-4-65 to Venkateshwar Temple and other lanes in Ward No.14 of Armoor Municipaltiy 417/05/201716 Feb 2018
6768Construction of CC DrainFrom N. Mahesh (H) to Nawab (H), Vegitable Market to H.No.2-4-95, Srinu H.No.2-3-75 to H.No.3-2-92 and other lanes in Ward No.14 of Armoor Municipaltiy 417/05/201716 Feb 2018
6869Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-I and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
6970Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-II and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7071Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-III and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7172Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-IV in Ward No.16 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7273Construction of CC drain and RCC slab from Aljapur Laxmi Narayana (H) to Chowl Prakash Bit-V and other lanes in Ward No.16 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7374Laying of CC road From Sudharshan Patwari (H) to Pragna School & Other Roads in Ward No.19 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7475Construction of CC drain From Rupesh (H) to Mdhan Mohan (H), Thirupathi (H) to Teddu Ganesh (H), H.no.1-9-69/4 to H.No.1-9-69/1, Munnnuru Kapu Sangam to D Sayanna (H) and other lanes in Ward No.19 of Armoor Municipality, Nizamabad District.517/05/201721 Mar 2018
7576Construction of CC drainFrom Nadiipi Bajanna (H) to Muthyamma (H), Sudharshan Patwari (H) to Pragna School, Anganwadi Building to Jawaharmai (H), Akula Abbanna (H) to Shankar (H) and other lanes in Ward No.19 of Armoor Municipality, Nizamabad District.517/05/201722 Feb 2018
7677Construction of CC drainFrom Kallu Batti to Akula Abbanna (H), Abdul Rahaman (H) to Municpal Bore well and other lanes in Ward No.19 of Armoor Municipality, Nizamabad District.517/05/201707 Mar 2018
7778Construction of CC drain From Mee seva to Pula Shankar (H), Shekar (H) to Siddeshwar (H), Masood (H) to Siddeshwar (H) and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7879Laying of CC road from Madharsa School to Taku Masjid & Other Lanes in Ward No.20 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
7980Construction of CC drainFrom H.No.1-3-55/1/2 to Javeed Bhai (H), Chikyala Rajeshwar (H) to Goshala and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8081Construction of CC drainFrom Kaligota Mohan (H) to Pothula Srinivas (H), H.NO.1-8-54/1 to Beside of Bodameda Bojamma, H.No.1-7-12/3 to Main Drain, SS Building to Weekly Market and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8182Construction of CC drain From Sudheer (H) to Akula Narayana (H), At H.NO.1-7-12/7/4, Heera Srinu (H) to Naveen (H), Nayeem (H) to Mujeeb (H) and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8283Construction of CC drain From Javeed Bhai (H) to Abdul Raheem (H), Mujedh (H) to Gangareddy (H), Vasavi Super Market to Gangadhar (H), Thrimurthi Medical to Sri Krishna Medical and other lanes in Ward No.20 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8384Laying of CC road From Takur Painter (H) to T shop, H.NO.1-6-48/11 to Thakur (H), Limbagiri Swami (H) to Padma rao (H), Syam Sunder (H) to infront of H.No.1-6-54/5/8/3 & Other Roads in Ward No.22 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8485Laying of CC road From Vidya School Praveen (H) to A Ravindhar (H), H.no.1-6-125/4/1 Bandari Narayana (H) to Dish Eshwar (H), In front of Mohan Rao Teacher (H), Hostel Narsaiah (H) to Madhava (H)& Other Roads in Ward No.22 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8586Construction of CC drainFrom H.No.1-6-4/1/3 to h.No.1-6-48/10/2, Limbadri Swami (H) to Padma Rao (H) and other lanes in Ward No.22 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8687Construction of CC drainFrom H.No.1-6-125/4/1 to Gomakula Anand (H), Hotel Narsaiah to Madhava (H) and other lanes in Ward No.22 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8788Construction of CC drain Buka Narsaiah Teacher (h) to Petrol Bunk Raju (H) in Ward No.22 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8889Laying of CC road From H.No.1-5-106/3/2 to H.No.1-5-108, & Other Roads in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
8990Laying of CC road From H.No. 1-6-64/1 to H.No.1-69/2, H.No.1-5-111 to 1-5-114, Syed Kazeem (H) to H.No.1-6-2, H.No.1-5-120/1 to H.No.1-5-119/1& Other Roads in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
9091Construction of RCC Culvert at Limbadri House ,Syed Mahmud Ali (H) , syed Ahmed (H), Mohd Rezwan (H), Shaik Mukthar (H) opp, Mohd Ahmed Ali (H), Mohd ahmedulla (H), Mubeen (H) 1-5-119/1, Mohd Nizamuddin (H), Habeeb Khan (H), Kathri Samaj beside, Abdul Rasheed(Ex-service men) (H), Kora Posani (H) opp, Mohd Khaza (H), Meer Mazhar Ali (H), Mohd Wahabuddin wajid(H), Mohd Nizamuddin (Retired APSEP Emply) in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
9192Construction of CC drain From Bhupal (H) 1-6-47/2/1 to H.No.1-6-47/2, MA Kaleem (H) 1-5-102 to Shaik Muktar (H) opp, and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
9293Construction of CC drainFrom H.No.1-5-114 to H.No.1-5-11, H.No.1-6-2 to H.No.1-6-12 and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
9394Construction of CC drain From Mohd Nizamuddin LI (H) to Mod Muneeruddin (H), Hotel Inthiyaz (H) to nearby open place and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
9495Construction of CC drain From Rajamani (H) to Shamseer (H), Shaik Rahmath Ali (H) to Kabeeruddin Moulana and other lanes in Ward No.23 of Armoor Municipality, Nizamabad District.517/05/201716 Feb 2018
9596Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality117/05/201716 Feb 2018
9697Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality117/05/201716 Feb 2018
9798Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality117/05/201716 Feb 2018
9899Construction of CC Drain and CC Road in Ward No.08 of Armoor Municipality117/05/201716 Feb 2018
99100Construction of CC Drain in Ward No.13 of Armoor Municipality117/05/201705 Mar 2018
100101Construction of CC Drain in Ward No.13 of Armoor Municipality117/05/201716 Feb 2018
101102Construction of CC Drain with Culvert in Ward No.04 of Armoor Municipality117/05/201716 Feb 2018
102103Construction of CC Drain in Ward No.04 of Armoor Municipality117/05/201716 Feb 2018
103104Construction of CC Drain in Ward No.07 of Armoor Municipality117/05/201716 Feb 2018
104105Construction of CC Drain in Ward No.16 of Armoor Municipality117/05/201716 Feb 2018
105106Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-I in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
106107Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-II in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
107108Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-III in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
108109Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-IV in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
109110Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-V in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
110111Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-VI in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
111112Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-VII in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
112113Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-VIII in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
113114Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-IX in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
114115Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-X in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
115116Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XI in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
116117Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XII in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
117118Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XIII in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
118119Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XIV in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
119120Construction of Under ground drainage from Gol Banglaw to Nehru statue Bit-XV in Armoor Municipality, Nizamabad District.517/05/201715 Feb 2018
120121Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.417/05/201716 Feb 2018
121122Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.417/05/201716 Feb 2018
122123Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.417/05/201716 Feb 2018
123124Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.417/05/201716 Feb 2018
124125Construction of CC drain near Mallareddy Cheruvu Armoor Municipality, Nizamabad District.417/05/201716 Feb 2018
125126Construction of CC drain in Saidabad Colony Ward No.06 Bit-I of Armoor Municpality, NiZamabad District 517/05/201721 Mar 2018
126127Construction of CC drain in Saidabad Colony Ward No.06 Bit-II of Armoor Municpality, NiZamabad District 417/05/201707 Mar 2018
127128Construction of CC Road at Take Masjid in Ward No.20 of Armoor Municpality, Nizamabad District117/05/201716 Feb 2018
128129 Construction of CC Drain H.No. 3-12-14 to 3-12-17 of Armoor Municpality, Nizamabad District417/05/201716 Feb 2018
129130N.H. 16 to Pinja Sayamma (H) ( Two Sides )of Armoor Municpality, Nizamabad District417/05/201716 Feb 2018
130131Laying of CC Road from Velding Nagesh (H) to Dr.Ashok , L.K. Hospital of Armoor Municpality, Nizamabad District417/05/201716 Feb 2018
131132Construction of C.C Drain from Gopi Bajanna House to Kartan Narayana House ( Two Sides ) of Armoor Municpality, Nizamabad District 417/05/201716 Feb 2018
132133Laying of CC Road from Post office to Buka Narsaiah Teacher (h) of Armoor Municpality, Nizamabad District417/05/201716 Feb 2018
133134Layin of CC Road in Ward No.19 of Armoor Municipality , Nizamabad District 517/05/201703 Apr 2018
134135Layin of CC Road in Ward No.18 of Armoor Municipality , Nizamabad District 517/05/201721 Mar 2018
135136Laying of CC Road H.No.1-13-20 to 1-13-15, G Linganna (H) to N Oddenna (H), Bajanna (H) to Nadipi Rajanna (H) and other Roads in Ward No.17 of Armoor Municpality, Nizamabad District517/05/201721 Mar 2018