SNoWORK_CODENAME_OF_THE_WORKADMIN_SANCTION_AMOUNTAGENCY_CR_DATEUPDATED_ON
11Construction of CC Drain from H No 3-1-103 to 3-1-104/2 and from H No.3-1-57 to 3-1-62 to 3-1-52 to H/O Gopal Mastry in W No 1 in Sangareddy Municipality530/05/201717 Feb 2018
22Construction of CC Drain and RCC slab culvert from Riyaz House to H No 3-1-118 to 3-1-109/3 to Roi-ki-talab and from 3-1-102 to cheruvu in W No 1 in Sangareddy Municipality530/05/201717 Feb 2018
33Construction of CC Drain from 3-1-74/1 to 3-1-76/A to 3-1-110/C to Roi-ki-talab and from H.No: 3-1-34 to cheruvu in W No 1 in Sangareddy Municipality530/05/201717 Feb 2018
44Construction of CC Drain from H/O Balaiah to H No 2-4-110/4/2/1, H.No.2-4-110/H/3 to Sattaiah house in W No 2 in Sangareddy Municipality3.530/05/201717 Feb 2018
55Construction of CC Drain from H.No. 2-4-101 to Yellamma Temple in W No 2 in Sangareddy Municipality4.530/05/201717 Feb 2018
66Construction of CC Drain & RCC Slab Culvert from H No 2-4-132 to 2-4-123 to JBS School and laying UGD from H.No.2-4-152 to 2-4-120 in W No 02 Sangareddy Municipality430/05/201717 Feb 2018
77Construction of UGD drain and RCC Slab culvert from H No 2-4-44 to2-4-44/E ,H No 2-4-34 to 2-4-36 to 2-4-33 and from H No 2-4-10 to 2-4-7 in Ward No.2 in Sangareddy Municipality330/05/201717 Feb 2018
88Construction of CC Drain & RCC Slab Culvert from H No 2-2-28 to Existing CC Road and from 2-2-28 to House of Aleem (2-2-81),Laying of U.G.D from House of Aleem (2-2-81) to existing cc road in W No 03 in Sangareddy Municipality430/05/201717 Feb 2018
99Construction of UGD drain and RCC Slab Culvert from Backside of Old Post Office to 2-3-155 to 2-3-109, H.No.2-3-111 to 2-3-161 to Hanuman Mandir in Ward No.3 in Sangareddy Municipality430/05/201717 Feb 2018
1010Construction of UGD drain from H.No.2-3-91 to 2-3-51 , 2-3-166 to 2-3-16/1 to 2-3-23 to 2-3-26 to 2-3-16 to 2-3-17 in Ward No.03 in Sangareddy Municipality430/5/201717 Feb 2018
1111Construction of CC Drain & RCC Slab Culvert from Bhavani Medical Store to 2-1-86 to Sana Fancy store in W No 04 in Sangareddy Municipality3.530/5/201717 Feb 2018
1212Construction of CC Drain from H No 2-1-131 to 2-1-124 to 2-1-122/1 to 2-1-119 in W No 04 in Sangareddy Municipality430/5/201717 Feb 2018
1313Construction of CC Drain & RCC Slab Culvert from Sana Fancy store to H No 2-1-170 to 2-1-134 to 2-1-131 in W No 04 in Sangareddy Municipality4.530/5/201717 Feb 2018
1414Construction of CC Drain & RCC Slab Culvert from 2-6-31 to 2-6-137 to 2-6-134 to House of Narsimlu Gupta in W No 05 Sangareddy Municipality530/5/201717 Feb 2018
1515Construction of CC Drain & RCC Slab Culvert from House of Narsimlu Gupta to old Audit office to 2-6-119/B to 2-6-108 and from 2-6-91 to 2-6-108 in W No 05 Sangareddy Municipality530/5/201717 Feb 2018
1616Construction of CC Drain & RCC Slab Culvert from H NO 2-6-16/A to 2-6-25 to 2-6-31 in W No 05 in Sangareddy Municipality230/5/201717 Feb 2018
1717Construction of RCC Drain with RCC Slab from H.No.2-7-20 to 2-7-23 in W No 06 in Sangareddy Municipality530/5/201717 Feb 2018
1818Construction of RCC Drain with RCC Slab from H.No.2-7-8 to 2-7-34 in W No 06 in Sangareddy Municipality530/5/201717 Feb 2018
1919Construction of RCC Drain with RCC Slab from H.No.2-7-37 to 2-7-62 in W No 06 in Sangareddy Municipality430/05/201722 Feb 2018
2020Construction of RCC Drain with RCC Slab from H.No.2-7-62 to 2-7-103 in W No 06 in Sangareddy Municipality430/5/201717 Feb 2018
2121Construction of CC Drain & RCC Slab Culvert from Thallapally Kaluva Road to 1-1-90/H/2 to 1-1-90/G in W No 07 Sangareddy Municipality3.830/5/201717 Feb 2018
2222Construction of CC Drain & RCC Slab Culvert from H No 1-1-120 to 1-1-114 to 1-2-95 & Laying of UGD from 1-1-125 to 1-1-121/A to 1-1-120 in W No 07 Sangareddy Municipality4.230/5/201717 Feb 2018
2323Construction of CC Drain from H No 1-1-90 to 1-1-98/1 Maruthi nagar in W No 7 in Sangareddy Municipality430/5/201717 Feb 2018
2424Construction of CC Drain from H No 1-1-98/1 to 1-2-13 in W No 7 in Sangareddy Municipality430/5/201717 Feb 2018
2525Construction of UGD drain from H.No.1-2-63 to 1-2-74 to House of Balakrishna to House of Police Narayana & from H.no 1-3-59 to 1-3-58 in Ward No.08 in Sangareddy Municipality 2.230/5/201717 Feb 2018
2626Construction of CC Drain & RCC Slab Culvert from Transformer to 1-3-1,1-3-146 to 1-3-160, 1-3-157 to 1-3-154 in W No 08 Sangareddy Municipality4.230/5/201717 Feb 2018
2727Construction of CC Drain from Transformer to Maruthi Nagar board W No 08 in Sangareddy Municipality530/5/201717 Feb 2018
2828Construction of UGD drain from H.No.1-3-16 to 1-3-136/B to 1-3-15 and from 1-3-20 to 1-3-134 & from H.no 1-3-121 to 1-3-127 to irrigation kaluva in Ward No.08 in Sangareddy 2.630/05/201717 Feb 2018
2929Construction of CC Drain & RCC Slab Culvert from H No 1-4-38 to 1-4-57 to 1-4-62/A in W No 09 Sangareddy Municipality4.330/5/201717 Feb 2018
3030Construction of CC Drain & RCC Slab Culvert from 1-4-60 to 1-4-64 and beside 1-4-64 &1-4-60 to 1-4-65 to Irrigation Kaluva and from 1-4-57 to 1-4-53/1 in W No 09 Sangareddy Municipality3.630/5/201717 Feb 2018
3131Construction of CC Drain from H No 1-5-62 to 1-5-76 & 1-5-46 to 1-5-56 in W No 09 in Sangareddy Municipality230/5/201722 Feb 2018
3232Construction of CC Drain from H No 1-5-76 to 1-5-46 to house of Tayyab bin abdullah in W No 09 in Sangareddy Municipality4.130/5/201722 Feb 2018
3333Construction of CC Drain & Slab from Vishweshwara Medical store to 6-6-77 in W No 10 in Sangareddy Municipality430/5/201722 Feb 2018
3434Construction of CC Drain & Slab from 6-6-77 to 6-6-86 in W.No.10 in Sangareddy Municipality430/5/201722 Feb 2018
3535Construction of CC Drain from 6-6-86 to Cheruvu in W No 10 in Sangareddy Municipality430/5/201722 Feb 2018
3636Construction of CC Drain & RCC Slab Culvert from H.NO 6-3-86 to house of Redamma cinema road in W No 11 in Sangareddy Municipality3.830/5/201722 Feb 2018
3737Construction of CC Drain & RCC Slab Culvert from 6-3-13/1 to cinema road in W No 11 in Sangareddy Municipality2.330/5/201722 Feb 2018
3838Construction of CC Drain & RCC Slab Culvert from H.No 6-2-131 to Mudhiraj Sangam & Laying of UGD from House of Ravi to 6-2-131 in W No 11 in Sangareddy Municipality2.430/5/201722 Feb 2018
3939Construction of UGD drain from H.No.6-2-25/A to 6-2-27 to 6-2-25/2 & 6-2-27 to house of ramachandra to backside of YMR garden & from H.no-6-2-115 to Cinema Road in Ward No.11 in Sangareddy Municipality4.530/5/201716 Feb 2018
4040Construction of UGD drain and slab culvert from H.No 6-1-148 to 6-1-149 to Womens degree college road in Ward No.12 in Sangareddy Municipality330/05/201722 Feb 2018
4141Construction of UGD drain at H.No.6-1-42 to 6-1-43 to 6-1-46 , from 6-1-43 to 6-1-67 to 6-1-54 and from 6-1-132 to 6-1-129 in Ward No.12 in Sangareddy Municipality2.330/5/201716 Feb 2018
4242Construction of UGD Drain and RCC Slab culvert from 6-1-113 to 6-1-115 in W.No.12 in Sangareddy Municipality2.130/5/201716 Feb 2018
4343Construction of UGD Drain from 6-1-122 to 6-1-123 to 6-1-126 in W.No.12 in Sangareddy Municipality2.630/5/201716 Feb 2018
4444Construction of CC Drain from Womens degree college to Old Excise office in W.No.12 in Sangareddy Municipality330/5/201722 Feb 2018
4545Construction of CC Drain & RCC Slab Culvert from 5-5-79 to 5-5-85 to H/O Shaik Hussain in W No 13 in Sangareddy Municipality4.530/5/201722 Feb 2018
4646Construction of CC Drain from H No 5-3-99 to 5-3-101 and from 5-5-47 to 5-5-45 in W No 13 in Sangareddy Municipality230/5/201722 Feb 2018
4747Construction of CC Drain & RCC Slab Culvert from 5-5-3 to 5-5-3/1 to H/O Abbas to H/O Abed in W No 13 in Sangareddy Municipality330/5/201722 Feb 2018
4848Construction of UGD drain from H.No.5-5-71to 5-5-78 and from H.No.5-5-64 to Madhina Masjid and beside H.No.5-3-10 and from H.No. 5-3-10 to 6-3-35 in Ward No.13 in Sangareddy Municipality3.530/5/201722 Feb 2018
4949Construction of CC Drain & RCC Slab Culvert from 6-4-133 to 6-4-131 in W No 14 in Sangareddy Municipality330/5/201722 Feb 2018
5050Construction of CC Drain & RCC Slab Culvert Madina hotel to 6-4-131 in W No 14 in Sangareddy Municipality3.530/5/201722 Feb 2018
5151Construction of UGD drain and slab culvert from Wajid house to Imran house, Mateen house to Jhanda and from Habeeb house to Ismail house and Beside H.No 6-4-2 in W.No.14 in Sangareddy Municipality3.830/5/201722 Feb 2018
5252Laying of UGD drain and slab culvert from House of Razzak to 6-4-18, from House of Mazeed to House of Ahmed,from H.No 6-4-19 to 6-4-1 and beside Arif Qureshi house in W.No.14 in Sangareddy Municipality3.730/5/201722 Feb 2018
5353Construction of CC Drain & RCC Slab Culvert from H/O Liaqath Hussain to 6-5-48 & Laying of UGD from 6-5-85 to Abed house in W No15 in Sangareddy Municipality4.730/5/201722 Feb 2018
5454Construction of UGD drain from H.No.6-5-13 to 6-5-12 to 6-5-70 & 6-5-12 to 6-5-11 ,from 6-5-57 to 6-5-11 to 6-5-120 and from H No 6-5-123/1 to 6-5-123/1/1 to beside 6-5-120 and at 6-5-58 in Ward No.15 in Sangareddy Municipality4.830/5/201722 Feb 2018
5555Construction of UGD drain from H.No.6-5-105 to 6-5-99 to 6-5-98 to 6-5-97/2, from 6-5-86 to 6-5-98 to 6-5-95 to house of sardar, beside H.No 6-5-93, beside H.No 6-5-91/B in Ward No.15 in Sangareddy Municipality4.530/5/201722 Feb 2018
5656Construction of Open Drain 0.60X0.45 from H.No.5-7-6 to 5-7-117 in W.No.16 in Sangareddy Municipality430/5/201722 Feb 2018
5757Construction of CC Drain 0.60X0.45 from H.No.5-7-117 to 5-7-48 in W.No.16 in Sangareddy Municipality230/5/201722 Feb 2018
5858Construction of Open CC Drain from H.No.5-7-104 to 5-7-106/2 & 5-7-107 to 5-7-110 in W.No.16 in Sangareddy Municipality230/5/201722 Feb 2018
5959Construction of UGD Drain from H.No.5-7-67 to 5-7-78/1,5-7-54/1 to 5-7-57,5-7-83 to 5-7-75,5-7-63 to 5-7-59 in W.No.16 in Sangareddy Municipality530/5/201722 Feb 2018
6060Construction of CC Drain from H.No.5-4-76 to 5-4-10,5-4-102 to 5-4-101 in W.No.17 in Sangareddy Municipality530/5/201722 Feb 2018
6161Construction of CC Drain from H.No.5-4-59 to 5-4-62,5-4-73 to 5-4-95/1 to 5-4-146 in W.No.17 in Sangareddy Municipality530/5/201722 Feb 2018
6262Construction of CC Drain from H.No.5-4-100 &5-4-152/2/1 to Police subhan in W.No.17 in Sangareddy Municipality330/5/201722 Feb 2018
6363Construction of CC Drain from H.No.5-8-138/4/3/6/A to 5-8-122/6/F (Azam house), 5-2-20 to 5-2-23/2,5-8-138 in W.No.18 in Sangareddy Municipality530/5/201722 Feb 2018
6464Construction of CC Drain from H.No.5-8-138 to 5-8-138/4/2 , 5-8-138/1/2 to 5-8-139/1/4/1, Judicial colony in W.No.18 in Sangareddy Municipality530/5/201722 Feb 2018
6565Construction of UGD Drain from H.No.5-8-139/4/6 to 5-8-35/5/5/31,5-8-138/4/3 to 5-8-130/5 W.No.18 in Sangareddy Municipality230/5/201722 Feb 2018
6666Construction of CC Drain from H.No.5-8-139/1/4/1 Judicial colony in W.No.18 in Sangareddy Municipality430/5/201722 Feb 2018
6767Construction of CC Drain from H.No.5-8-122/6/6/2 to Existing CC Road to Kalwakunta in W.No.19 in Sangareddy Municipality530/5/201722 Feb 2018
6868Construction of CC Drain from Kalwakunta CC Road to 5-8-139/2/1,5-8-74/10/Din W.No.19 in Sangareddy Municipality530/5/201722 Feb 2018
6969Construction of CC Drain from Srividyaniketan School to 5-8-122/E/1 Kalvakunta530/5/201722 Feb 2018
7070Construction of CC Drain Ramana house to Narayanreddy Colony approach road 430/5/201722 Feb 2018
7171Construction of CC Drain from Sevalal maharaj house to Ameti Set house 530/5/201722 Feb 2018
7272Construction of UGD from Shohail house to Prabhakar goud house near at K.Latha Ex-Accountant Latha madam house,Jyothi vasantha to Riyazuddin house Shanthinagar530/05/201722 Feb 2018
7373Construction of CC Drain from PCB office to Ameti Set house 430/5/201722 Feb 2018
7474Construction of CC Drain from H.No.5-1-87/2/3 to 5-1-87/2/3,5-8-124/156 to 5-8-127/136/4530/05/201716 Feb 2018
7575Construction of CC Drain from H.No.5-8-124/77/22 to 5-8-124/90/1& 5-8-124/50/3, 5-8-124/54 & 5-8-124/65/2530/05/201716 Feb 2018
7676Construction of CC Drain From H.No.5-8-124/15 to 5-8-124/7 & 5-8-124/10 to Yellamma Temple & 5-8-124/15 to 5-8-124/30/5530/05/201716 Feb 2018
7777Construction of CC Drain From H.No.5-8-124/4/38 to 5-8-124/25/A & 5-8-124/90/3 to 5-8-124/90530/05/201716 Feb 2018
7878Construction of CC Drain from H.No.5-8-124/54 to 5-8-124/28/1 to 5-8-124/132/1 Sanjeev nagar W No 21530/05/201722 Feb 2018
7979Construction of CC Drain from J.Eshwaraiah H.No.4-8-69/A/1 to 4-8-75/1,Cement Shop 4-8-80 to 4-8-81/1,4-8-69/D to 4-8-69/2/1 in W.no.22530/05/201716 Feb 2018
8080Construction of CC Drain from Gousuddin house to Balaji Function Hall to Existing CC Drain and Culvert in W.no.22530/05/201716 Feb 2018
8181Construction of CCDrain from H.No.4-8-27 Big Traders main road in W.no.22330/05/201716 Feb 2018
8282Construction of UGD Drain from Reddy Anna house to Balaji Function Hall in W.no.22230/05/201716 Feb 2018
8383Construction of UGD Drain Vijaya laxmi hardware shop to Srinivas house to Shivaraj to Raju Goud in W.no.22530/05/201716 Feb 2018
8484Construction of CC Drain from 4-7-25/9/2/3 to 4-7-3/8/1 to 4-7-3/3/8 in W.no.23530/05/201716 Feb 2018
8585Construction of CC Drain from 4-7-25/7/6 to 4-7-25/19 at Balaji temple in W.no.23530/05/201716 Feb 2018
8686Construction of CC Drain From Zion School Opposite to water to Plot No.02, 4-7-25 & Rishi Public School to 4-7-25/5 in W.no.23530/05/201716 Feb 2018
8787Construction of CC Drain Ramchandar 4-7-1/94 to 4-7-25/2/7, 4-7-169 to 4-7-25/8/3/1 in W.no.23530/05/201716 Feb 2018
8888Construction of CC Drain from 0.45 x 0.45mts drain at indira colony 4-6-45 to 4-6-46,4-6-1 to Existing CC Road junction near at Kallu Compound in W.no.24530/05/201716 Feb 2018
8989Construction of CC Drain from Drivers colony compound wall to Siddappa house in W.no.24530/05/201716 Feb 2018
9090Construction of CC Drain from H.No.4-5-78/A/1 to Compound wall at Drivers colony & 4-6-116/1 to 4-6-126/10/2 in W.no.24530/05/201716 Feb 2018
9191Construction of CC Drain from Kallu compound junction to 4-6-129 at Indira Colony & 4-6-127/9/1 to Khader Kiran at drivers colony in W.no.24530/05/201716 Feb 2018
9292Construction of CC Drain from Hanuman mandir to Revenue colony and kishan house in W.no.24530/05/201716 Feb 2018
9393Construction of CC Drain from Bypass Road to Chandra shekar house Revenue colony in W.no.24530/05/201716 Feb 2018
9494Construction of CC Drain from H.No.4-5-73/65/7 to 4-5-73/65/1,ODF col wno.24530/05/201722 Feb 2018
9595Construction of CC Drain KMR Graniate main road to 4-7-8/26 Pragathi nagar in W.no.24530/05/201716 Feb 2018
9696Construction of CC Drain Defence employees housing society Pragathi nagar in W.no.24530/05/201716 Feb 2018
9797Construction of CC Drain Manik Prabhu house to defence employee housing society Pragathi Nagar to Brundavan Colony, 4-7-24/E/9/1 to Sanjeeva Rao house ODF Venture -I in W.no.24530/05/201716 Feb 2018
9898Construction of CC Drain at Rajampet 4-2-99/2 to 4-2-156/1 to 4-2-101/1 to 4-2-105 to 4-2-100 in W.no.25530/05/201716 Feb 2018
9999Construction of CC Drain from 4-2-20, Hanuman Shelter, 4-2-69/1 to 4-2-69/11 at Rajampet in W.no.25230/05/201716 Feb 2018
100100Construction of CC Drain from 4-2-140 to 4-2-121/A,4-2-139,4-2-133/1 to 4-2-13 at Rajampet in W.no.25530/05/201716 Feb 2018
101101Construction of CC Drain from 4-2-197 to 4-2-139 At Rajampet in W.no.25230/05/201716 Feb 2018
102102Construction of CC Drain from 4-4-80 to 4-4-79,4-4-79 to 4-4-71/1,4-4-70 to 4-4-62 at indira colony in W.no.26530/05/201716 Feb 2018
103103Construction of CC Drain from 4-3-101 to 4-3-99,4-3-99 to 4-3-98/1 & 4-4-62 to 4-4-56 and 4-4-10 to 4-4-103 (Employment Gopal to Shamantha) at indira colony in W.no.26530/05/201716 Feb 2018
104104Construction of CC Drain from Pochaiah house to Golla Vittalaiah and 4-3-78/1 to Thomas house and 4-3-78/1 to 4-3-86 (veeraiah) in W.no.26330/05/201716 Feb 2018
105105Construction of CC Drain Anantharam house to 4-10-45 to Existing drain 4-10-19 to 4-10-18,4-10-24 to 4-10-17 at Vijayanagar Colony in W.No.27530/05/201716 Feb 2018
106106Construction of CC Drain at Viajayanagar 4-10-81/1/A to 4-10-43/2 to 4-10-25/C at Vijayanagar Colony in W.No.27530/05/201716 Feb 2018
107107Construction of CC Drain at Vijayanagar from 4-10-114/8/1 to 4-10-114/A/2, 4-10-114/10 to 4-10-114/3/1 ,4-10-114/10 to 4-10-114/9, 4-10-97/1 to 4-10-81/6 at Vijayanagar Colony in W.No.27530/05/201716 Feb 2018
108108Construction of CC Drain from Prabhakar reddy house to backside of income Tax Office in Veerabadranagar colony in W.No.28530/05/201716 Feb 2018
109109Construction of CC Drain from new Manjeera School to Rukhmini Talkies in W.No.28330/05/201716 Feb 2018
110110Construction of CC Drain from Nagarjuna junior college to Sardar house in Sainik nagar W No 28330/05/201716 Feb 2018
111111Construction of CC Drain from Krishna teacher house to backside of income Tax Office in Veerabadranagar colony in W.No.28330/05/201716 Feb 2018
112112Construction of UGD at 4-8-113 to Bipass road at Manjeera nagar in W.No.28230/05/201717 Feb 2018
113113Construction of CC Drain 0.60x0.45 from 3-4-102/1/B/3 to 3-4-100/1 at Rajampet in W.No.29530/05/201717 Feb 2018
114114Construction of CC Drain 0.60x0.45 from 3-4-100/1 to Nagarjuna Junior College at Rajampet in W.No.29 530/05/201717 Feb 2018
115115Construction of CC Drain 0.60x0.45 at Rajampet Road Gas Godown in W.No.29330/05/201717 Feb 2018
116116Construction of CC Drain from Govt School to Rajampet X road in W.No.29230/05/201717 Feb 2018
117117Construction of CC Drain from 3-5-103 to 3-5-96 to Ex-Chairman Ramchandar house in W.No.30530/05/201717 Feb 2018
118118Construction of CC Drain 3-5-94 to 3-5-96/1,3-3-94 to Ashok house Padma house to Mallikarjun & New Baba Nagar 5 Culverts 530/05/201717 Feb 2018
119119Construction of CC Drain Balver lodge backside at Veerabadra nagar530/05/201717 Feb 2018
120120Construction of CC Drain from 3-3-150/95/a to 3-3-150/A/1,3-3-150 to 3-3-150/7530/05/201717 Feb 2018
121121Construction of CC Drain 3-3-150/160/A/1 to 3-3-150/62 to Millatary pochamma backside to Opp 530/05/201717 Feb 2018
122122Construction of CC Drain from 3-2-127 to 3-2-116,3-2-109530/05/201717 Feb 2018